Knowledge base for metalwork and fabrication for when someone on the scaffolding asks how big the gate at Huber’s was.

Drawings, test certificates, quotations, drive documentation and the things only your master craftsman knows, all in one place. Every answer shows its source. The demo uses sample drawings from metalwork; you try it on your own drawings in the first weeks after go-live.

Everyday question

“What size was the gate at Huber’s, and which drive is fitted?”

The answer is in

Drawing 2019-041 · Order confirmation · Maintenance record

1 Source in one click

Day to day

Sound familiar?

  • The lad on the scaffolding wants to know what size the gate at Huber’s was – and I have to drive back to the workshop and dig out the drawing.

  • Franz knows which spare parts fit the drives from 2009. Franz is 62.

  • Every complaint about a wrong measurement means another trip out.

Half past four on a Friday and the site foreman rings: acceptance of the stair railings at the housing development has been brought forward to Monday, and the site manager wants to see the paperwork for the posts first – the 3.1 inspection certificate for the steel, the welding records, the approved workshop drawing. The steel came in March, the delivery notes are in the binder in the workshop, and the dealer emailed the certificate to a colleague who has been on parental leave since July. So on Saturday morning the boss goes through two mailboxes, the site folder and the pile that has been sitting on the workbench since the refit. In the end everything turns up. The paperwork was there all along – just not where someone needs it at seven on Monday morning.

Things people in this industry say every day.

Example questions

Questions from your day-to-day work

Three questions that come up day to day, and the document where you would expect to find the answer. In the demo you see this with sample documents; you test it with your own documents in the first weeks after go-live.

  • “What size was the gate at Huber’s, and which drive is fitted?”

    1 Drawing 2019-041 · Order confirmation · Maintenance record

  • “Show me all test certificates for batch X.”

    2 Test certificates under EN 1090

  • “What did we quote customer Huber in 2023?”

    3 Quotation from the ERP

Documents

The documents that matter to you

  • Workshop and installation drawings as DXF, DWG or PDF, including scanned older plans
  • Test certificates under EN 1090
  • Quotations and cost calculations from the ERP
  • Manufacturer documentation for the drives
  • Photos from site
  • The master craftsman’s voice notes

Pricing

What it costs

Basic package

from€500per month

Set-up fee €2,900 · excl. VAT

A flat fee per company. Everyone at your company can use it – technicians as much as office staff – with no per-user licence. One-click connections are included in the set-up. Before we start, we check whether your industry-specific software can be connected; that connection is charged on a time-and-materials basis, agreed in advance.

Drafts as Word, PDF or email are included in the Premium package.

At the kick-off we agree on twenty questions together – along with the documents each answer should come from. At sign-off we go through them together and look at what the system does with them. What follows from that is set out in the quotation.

Compare all packages

Getting started

Where to start

Start with the workshop and installation drawings as they are on the server – DXF, DWG, the PDF printouts and the scanned plans from the nineties. That’s where the questions from the scaffolding come from, and you don’t need an export from your industry-specific software. In the first weeks after go-live you put exactly these questions to your own drawings: which dimension, which drive, which drawing is current. You’ll see whether the answer comes with the right source and where your scans or file names cause trouble. The second step adds the paperwork around acceptance: delivery notes, inspection certificates, welder qualification certificates, the steel dealer’s emails. As documents are read in, someone on your team confirms the document type, because that determines who can see the document later. Before we start, we check whether QOMET or TaxMetall can be connected and which order numbers you search by day to day; the connection is set up and charged on a time-and-materials basis, agreed in advance.

FAQ

Frequently asked questions

Acceptance is coming up and we’re missing the material certificates. How does having our documents in the system help?

That’s a good thing to try in the first weeks after go-live. Load the delivery notes, inspection certificates and dealer emails for a completed order and ask which certificates are on file for it. The answer gives file, page and date; if the system finds nothing, it tells you so – and you know on Friday, not at seven on Monday, that you need to request them from the dealer. You’ll already know the distinction that matters here: only a 3.1 inspection certificate under EN 10204 can be traced back to the batch; a 2.2 test report only covers non-specific testing. A few real sheets will show whether your scans are legible enough for this.

The client is asking for the declaration of performance. Can the system help?

The declaration of performance is issued by you, not by the system: for load-bearing steel components EN 1090-1 requires it together with CE marking, and from execution class EXC2 your factory production control (FPC) must be certified. Where the system helps is in pulling things together – the FPC certificate and its date, the valid welder qualifications, the material certificates, last year’s declaration of performance for a similar component as a template, each with its source. From these it can produce a draft as a Word or PDF file. You check it, sign it and send it. How useful such a draft is with your documents is something to test in the first weeks after go-live, on a component you know well.

Some of our welder qualifications are about to expire. Will the system remind us?

There’s no reminder function – the system answers when you ask and sends nothing on its own. If the certificates under ÖNORM EN ISO 9606-1 (the Austrian edition of the European standard) are in your documents as scans, you can ask which welder holds which qualification, what date it carries and when the welding coordinator last confirmed it; the answer shows the source. That is exactly what validity depends on: without the six-monthly confirmation that the welder has actually been welding within the scope of the qualification, the certificate lapses before the printed date; depending on the route chosen, it is extended after two or three years. Reminders stay wherever you keep them today.

We installed a power-operated gate at a customer’s premises. What do we have on file for the periodic inspection?

The duty lies with the employer at the workplace – that is, your customer: under § 8 AM-VO (the Austrian Work Equipment Ordinance), power-operated doors and gates must be inspected at least once every calendar year and no more than 15 months apart. The customer can bring in other suitably qualified people for this – you, for instance; if they use their own staff, a person as defined in § 7(3) or (4) AM-VO must be involved at least every fourth year. You can ask when someone from your company was last there, which drive and which safety device are fitted and what was replaced. The answer draws on the inspection record, the order and the photo and names the file each time; if one of them is missing, the system tells you so.

Request a demo – with examples from Metalwork & fabrication

In a 30-minute video call, we use sample documents from your industry to show you how questions are answered and what the source for each answer looks like. You don’t need any of your own documents for this.