Knowledge base for building contractors when the site foreman asks which concrete grade goes into the basement.

Bills of quantities, foreman’s drawings, daily site reports, time-and-materials sheets, variations and handover records in one place, every answer with its source. Ask from your phone in the site cabin or at your desk in the office. The demo runs on sample construction documents; you see how it copes with your own in the first weeks after go-live.

Everyday question

“Which concrete grade and which exposure class were specified for the floor slab?”

The answer is in

Bill of quantities · Concrete delivery note

1 Source in one click

Day to day

Sound familiar?

  • The foreman rings wanting to know the concrete grade for the basement – and the bill of quantities is in a binder back at the office.

  • The client says that was included in the lump sum. Our time-and-materials sheet from back then is somewhere in the site cabin.

  • Only Sepp, the site manager, knows why we did the underpinning differently on the 2016 extension. And Sepp’s leaving in the spring.

Friday afternoon, and the final invoice for the project is due to go out. The client’s site supervision (ÖBA) has struck out three time-and-materials items, saying the sheets were never countersigned. The site manager knows the foreman presented them on site at the time – he took the photo himself, and it’s in his phone gallery among six hundred other site pictures. The daily site report for that day is a scan in the project folder, filed as SCAN_0447. The related claim for additional costs was notified by email, from the mailbox of a site manager who left in the summer. That afternoon, three people search through binders, mailboxes and the site cabin. Two of the three records turn up. The third item is written off – not because the work wasn’t done, but because nobody can say any more where the proof is.

Things people in this industry say every day.

Example questions

Questions from your day-to-day work

Three questions that come up day to day, and the document where you would expect to find the answer. In the demo you see this with sample documents; you test it with your own documents in the first weeks after go-live.

  • “Which concrete grade and which exposure class were specified for the floor slab?”

    1 Bill of quantities · Concrete delivery note

  • “What did we write about this variation, and how did the client’s site supervision (ÖBA) respond?”

    2 Claim for additional costs · Correspondence with the ÖBA

  • “Which defects from the handover are still outstanding, and when does the warranty period end?”

    3 Handover record · Deadlines from the construction contract

Documents

The documents that matter to you

  • Bills of quantities and tender documents, including as data files under the Austrian standard ÖNORM A 2063
  • Cost estimates with the K-sheets under ÖNORM B 2061
  • Construction contracts under ÖNORM B 2110, variations and claims for additional costs
  • Foreman’s, formwork and reinforcement drawings, together with structural calculations and bar schedules
  • Daily site reports, time-and-materials sheets, measurements and concrete delivery notes
  • Handover records, defect lists and the health and safety plan (SiGe-Plan) under the Construction Work Coordination Act (BauKG)
  • Site photos and the foreman’s voice notes

Pricing

What it costs

Basic package

from€500per month

Set-up fee €2,900 · excl. VAT

A flat fee per company. Everyone at your company can use it – technicians as much as office staff – with no per-user licence. One-click connections are included in the set-up. Before we start, we check whether your industry-specific software can be connected; that connection is charged on a time-and-materials basis, agreed in advance.

At the kick-off we agree on twenty questions together – along with the documents each answer should come from. At sign-off we go through them together and look at what the system does with them. What follows from that is set out in the quotation.

Compare all packages

Getting started

Where to start

Start with the project directory on your server. Bills of quantities, drawings and correspondence are already organised by project there – which is also how you’ll ask about them later. Who sees what, however, doesn’t depend on individual folders: you assign access by document type and role, so the cost estimate goes to site management and the foreman’s drawing to the people on site. For the first weeks after go-live, take two completed projects and one that is still running. The running one shows whether the answers are any use in the site cabin; the completed ones show whether the warranty questions that still come in years later are answered with the right source. Before we start, we check whether AUER, ABK, BauMaster or your server can be connected.

FAQ

Frequently asked questions

The client’s site supervision is striking out time-and-materials items because the sheets aren’t countersigned. Can the knowledge base help?

It can show what you have to hand. The deadline itself is in the contract: where ÖNORM B 2110 is agreed, daily records of time-and-materials work must be kept and submitted to the client within the agreed period to confirm type and scope – if no period is agreed, it is seven days. If the sheet arrives later, you have to prove the work by other means. You ask by project and item; the answer gives the time-and-materials sheet, daily site report and correspondence with date and source, as far as they are in the knowledge base, and if the system finds nothing, it tells you so. The contract is not interpreted; the assessment is still yours.

Our daily site reports and time-and-materials sheets are handwritten. Is scanning them any use?

How well scanned handwriting is read depends heavily on the writing: neat block capitals are a different matter from hours scribbled down in a hurry. That’s something to establish in the first weeks after go-live with a stack of real reports – including whether illegible passages are flagged as such. So that you can check, every answer gives the page it comes from. With the daily site report, it’s worth looking at the date it was sent: under ÖNORM B 2110 it must be handed over within two weeks, and if two weeks pass without objection, it is deemed confirmed. That date is on the scan or in the email it was sent with.

There are five revisions of a foreman’s drawing. Which one does the answer give?

The answer gives the revision with its index and date from the title block, plus the source. In the first weeks after go-live, check with a drawing that exists in several revisions whether the answer also points out that older ones exist. Site management still decides which revision applies on site. If you ask for the drawing for a building element, the file path is included, so the foreman gets the right one rather than whichever happened to be on top. If the system finds no drawing for that element, it tells you so.

We did notify the additional costs – it’s just that nobody remembers how.

That’s a typical question for the knowledge base. Under ÖNORM B 2110, a disruption to performance must be notified without delay as soon as its effects become apparent; the notification should state the reason, the estimated amount and the expected delay to the construction period, and it should be in writing, because if it comes to it, you are the ones who have to prove it. If the mailbox is included, you can ask about the notification; the answer gives date, recipient and source – even from the mailbox of a site manager who left long ago, as long as it still exists. What was only said in a meeting and never written down won’t turn up here either; if the system finds nothing, it tells you so.

Request a demo – with examples from Building contractors

In a 30-minute video call, we use sample documents from your industry to show you how questions are answered and what the source for each answer looks like. You don’t need any of your own documents for this.