Knowledge base for electrical contractors for questions about inspection reports and wiring diagrams that would otherwise land with the site manager.

Installation files, inspection reports, wiring diagrams, manufacturer documentation and test records in one place, every answer with its source. Ask from your phone in the basement or at your desk in the office. The demo uses sample documents from electrical contracting; you find out how well it works with your own in the first weeks after go-live.

Everyday question

“What did the last inspection report say about customer Mayer’s installation?”

The answer is in

Inspection report · Test record

1 Source in one click

Day to day

Sound familiar?

  • The electrician’s down in the basement and needs the report from the last inspection – and it’s in the binder back at the office.

  • Which wiring diagram is the right one now – the 2018 one or the one from after the refurbishment?

  • The site manager gets rung three times a day because nobody else knows how the customer’s installation is set up.

The labour inspectorate announces a visit to one of your customers, a joinery, and wants to see the inspection reports for the electrical installation. You carried out the inspection two years ago; Michi was the one on site. At the time someone emailed the report as a PDF to the operations manager, who has since left. On your side it exists three times: in the installation’s project folder, in sent mail and as a signed scan in a folder someone named “Reports new” years ago. On Tuesday morning nobody can say for sure which one is the signed final version. So the office rings Michi, who is on a job in the Montafon valley and can’t check the folder from there either. The visit is the day after tomorrow.

Things people in this industry say every day.

Example questions

Questions from your day-to-day work

Three questions that come up day to day, and the document where you would expect to find the answer. In the demo you see this with sample documents; you test it with your own documents in the first weeks after go-live.

  • “What did the last inspection report say about customer Mayer’s installation?”

    1 Inspection report · Test record

  • “Which wiring diagram is current after the refurbishment?”

    2 Wiring diagram revision B · Installation report

  • “What does this error message mean on this type of device?”

    3 Manufacturer documentation

Documents

The documents that matter to you

  • Installation files per property
  • Inspection reports and test records
  • Wiring diagrams, including older versions
  • Manufacturer documentation for the components
  • Photos of the distribution board
  • Voice notes from site

Pricing

What it costs

Basic package

from€500per month

Set-up fee €2,900 · excl. VAT

A flat fee per company. Everyone at your company can use it – technicians as much as office staff – with no per-user licence. One-click connections are included in the set-up. Before we start, we check whether your industry-specific software can be connected; that connection is charged on a time-and-materials basis, agreed in advance.

Drafts as Word, PDF or email are included in the Premium package.

At the kick-off we agree on twenty questions together – along with the documents each answer should come from. At sign-off we go through them together and look at what the system does with them. What follows from that is set out in the quotation.

Compare all packages

Getting started

Where to start

Start with the installation files for each property as they are on the server today – inspection reports, wiring diagrams, handover records, sorted by customer. That is exactly what people ask about from the basement. In the first weeks after go-live, pick two or three properties whose history you know, ask what the last inspection report said and which wiring diagram applies after the refurbishment, and see whether the answer comes with the right source. Your folder structure stays as it is: the files are encrypted and mirrored only over outgoing connections. Manufacturer documentation follows once it’s clear which device ranges you actually install. Before we start, we check whether pds can be connected; until then you upload files yourself – whole folders, emails, the photos of the distribution board.

FAQ

Frequently asked questions

How many inspection reports have to be kept for an installation?

The duty to keep them lies not with you but with the employer at the workplace – your customer. Under § 11 ESV 2012 (the Austrian Electrical Protection Ordinance), at least the reports from the last two periodic inspections must be kept; if the inspection interval is longer than three years, the report on the last inspection is enough, and the reports must be available for inspection at the workplace or on site. For you, the other side of it matters: you can ask which version you yourselves have on file for this property, and the answer gives date, file and page. Whether it also flags that two versions with the same inspection date are lying around is a good thing to check in the first weeks after go-live.

The customer has a KNX system. Can we get at the group addresses?

The ETS project stays in ETS – it’s a programming file, not a document. What belongs in the knowledge base is what you export from it and hand over to the customer anyway: the group address list as a PDF or spreadsheet, the functional description, the distribution board plan, the photos of the actuators. In the first weeks after go-live, try it with a real list to see whether these exports give a useful answer to which group address sits on which actuator channel. If the system finds no export, it tells you so – and you know to put a printout in the installation file on the next project.

The apprentice should be able to see the manufacturer documentation but not the cost calculation. Is that possible?

That’s what permissions are for, and they work by document type and role, not by individual file: manufacturer documentation, installation instructions and test records for everyone who goes out on site; cost calculations, change orders and personnel documents for the office only. We configure this once with you during set-up, so nobody has to fiddle with it on their own. During onboarding it’s worth trying exactly this: ask about the cost calculation using the apprentice’s role and see what comes back.

Can the system write the inspection report for us?

It can produce a draft as a Word or PDF file from what you have on the installation: property details, distribution board designations, the list from the last inspection report, the installation report – each detail with the file it comes from. The measured values come from your test instrument; the assessment and signature come from the person who was on site. The system doesn’t inspect, approve or send anything. Whether such a draft saves you work becomes clear in the first weeks after go-live – try it with an installation whose last inspection report you wrote yourself.

Request a demo – with examples from Electrical contractors

In a 30-minute video call, we use sample documents from your industry to show you how questions are answered and what the source for each answer looks like. You don’t need any of your own documents for this.