Knowledge base for electrical contractorsfor the question about inspection reports and wiring diagrams that otherwise lands with the site manager.

Installation files, inspection reports, wiring diagrams, manufacturer documentation and test records in one place, every answer with its source. Ask from your phone in the basement or at the screen in the office — whether and how well this works with your documents, you check in a demo.

Everyday question

“What did the last inspection report say about the installation at customer Mayer’s?”

The answer is in

Inspection report · Test record

1 Source in one click

Day to day

Sound familiar?

  • The electrician is standing in the basement and needs the report from the last inspection — it’s in the binder at the office.

  • Which wiring diagram applies now, the one from 2018 or the one after the refurbishment?

  • The site manager gets called three times a day, because nobody else knows how the installation at the customer’s is set up.

The labour inspector announces a visit to your customer, a joinery, and wants to see the inspection reports on the electrical installation. You did the inspection two years ago; Michi was the one on site. Back then someone emailed the report as a PDF to the operations manager, who no longer works there. At your end it exists three times: in the installation’s project folder, in the sent mail and as a signed scan in a folder someone named “Reports new” years ago. On Tuesday morning nobody knows for certain which of them is the signed final version. So the office phones Michi, who is on a site in the Montafon valley and can’t look in the folder from there either. The appointment is the day after tomorrow.

Statements as they come up day to day in this industry.

Example questions

Questions from your day-to-day work

Three questions as they come up day to day, and the document in which the answer should be found. Whether and how well the answer comes with its source, you check in a demo with your own documents.

  • “What did the last inspection report say about the installation at customer Mayer’s?”

    1 Inspection report · Test record

  • “Which wiring diagram applies after the refurbishment?”

    2 Wiring diagram revision B · Installation report

  • “What does this error message mean on this device type?”

    3 Manufacturer documentation

Documents

The documents that matter to you

  • Installation files per property
  • Inspection reports and test records
  • Wiring diagrams, including older versions
  • Manufacturer documentation for the components
  • Photos from the distribution board
  • Voice notes from the site

Pricing

What it costs

Basic package

from€500/ month

One-off setup €2,900 · net

A flat fee per company. Everyone at your company may ask — the technician just as much as the office, no per-head licence. Whether a connection to your system is possible, we check before we start; one-click connections are included in the setup, others are billed by effort, and what they cost is fixed beforehand.

At the kickoff we record twenty questions that the acceptance is based on.At the kickoff we agree on twenty questions together – along with the documents the answer should come from. At acceptance we go through them together and look at what the system does with them. What follows from that is set out in the offer.

Compare all packages

Getting started

Where you start

Begin with the installation files per property as they sit on the server today — inspection reports, wiring diagrams, handover records, sorted by customer. That is exactly what people ask about from the basement. For the demo, take two or three properties whose history you know and ask what the last inspection report said and which wiring diagram applies after the refurbishment; then you see whether the answer comes with the right source. Your folder structure stays as it is: the files are encrypted and mirrored only over outgoing connections. Manufacturer documentation is added once it is clear which device ranges you actually install. Whether pds can be connected, we check before we start; until then you upload — whole folders, emails, the photos from the distribution board.

FAQ

Frequently asked questions

How many inspection reports must be available for an installation?

It is not you who must keep them, but the employer at the workplace — that is, your customer. Under § 11 ESV 2012 (the Austrian Electrical Protection Ordinance), at least the last two reports from the periodic inspections must be kept; if the inspection interval is longer than three years, the report on the last inspection is sufficient, and they must be available for inspection at the workplace or on site. For you, the other half counts: you can ask which version you yourselves have filed for this property, and the answer names date, file and page. Whether it also becomes visible that two versions with the same inspection date are lying around is a good point to check in a demo.

The customer has a KNX system. Can we get at the group addresses?

The ETS project stays in ETS — it is a programming file, not a document. What belongs in the knowledge base is what you export from it and hand over to the customer anyway: the group address list as a PDF or spreadsheet, the functional description, the distribution board plan, the photos of the actuators. Whether the question of which group address sits on which actuator channel is answered usefully from these exports, you try out in a demo with a real list. If the system finds no export, it says so — and you know that a printout belongs in the installation file on the next project.

The apprentice should see the manufacturer documentation but not the cost calculation. Is that possible?

That is what the permissions are for, and they depend on document types and roles, not on individual files: manufacturer documentation, installation instructions and test records for everyone who goes out to site; cost calculations, change orders and personnel documents only for the office. This is set once during setup together with you, so that nobody has to fine-tune things on their own. In a demo it is worth playing through exactly this: ask about the cost calculation with the apprentice’s role and see what comes back.

Can the system write the inspection report for us straight away?

It can create a draft as a Word or PDF file from what you hold on the installation: property data, distribution board designations, the list from the last inspection report, the installation report — each detail with the file it comes from. The measured values come from your test instrument, the assessment and the signature from the person who was on site. The system inspects nothing, approves nothing and sends nothing. Whether such a draft saves you work, you see in a demo with an installation whose last inspection report you wrote yourself.

Request a demo — with examples from Electrical installation

In thirty minutes by video we show you, using examples from your industry, how questions are answered and what the source for each answer looks like. You do not need your own documents for this.